Wednesday, January 27, 2016

Sockwatch '16

As you'll no doubt remember, one of the goals I set for myself is to complete 16 socks in 2016 (not pairs of socks... I'm not a mad-woman, just sixteen socks.  They don't even have to all have mates.)

There are 52 weeks in the year, and divide that by 16 socks you get...

pulls out calculator app on computer, sticks tongue out while poking the buttons

... 3.25.  So figure I knit one sock every three weeks, I'm golden.

And when I put it like that it sounds like crazy talk.  But I'll remind you that I knit 7 pairs of socks in 2015 without particularly trying.  I also once knit 4.5 socks in one memorable February.

It's a stretch goal, is what I'm saying.  But achievable.  My good sense and the need to not attract public humiliation and a good sound smiting from the Knitting Goddess will keep me from declaring it "a piece of cake" or "no problem," but I'm cautiously optimistic.

It helps that I'm all but a kitchener away from having 2 socks done already.

Matchy-matchy Achievement:  Unlocked!
And since I knew that sock knitting was a big part of my 2016 Knitting Goals, I very cleverly (I hope) proposed two pairs of socks as part of my "Order Mission" in the Harry Potter Knitting and Crochet House Cup.   A Mission should represent 6-8 weeks worth of work, and we got the green light to cast on Sunday, January 24.

I'm knitting Crocus vernus Socks by Hunter Hammerstein.  These are from her Knitter's Curiousity Cabinet, Vol. 1 collection.  It's a series of sock patterns that are based on drawings of various botanical subjects.  Lovely.  I'll be knitting more from this book, I think.


I had trouble getting a color accurate picture of these -- the yarn is slightly less variegated appearing in person.  Overall I'm really pleased with how they're coming along.

I've also started what I'm calling my Zombody Loves You socks.  I'm using the Vanilla Latte Socks pattern by Virginia Rose-Jeanes.  The yarn has a spiraling effect that is presenting as almost self-striping.  They are my post-apocalyptic Valentine's Day socks.


I came really close to knitting these in a traditional "welt" pattern and calling them "Love Hurts" because I think I'm funny.

I went ahead and cast both pairs on at once because the Crocus vernus are too involved for good purse knitting, and sometimes a girl just needs to knit something she doesn't really have to think about.

These two pair both have to be done by March 20, or I won't get my invisible internet points (internet points are remarkably motivating, turns out.)

And of course, I do still have the first sock of a pair of Monkeys on the needles.  They'll get their turn too.  Here's a picture I took last October, which is the last time I actually laid hands on them.  


#sockwatch16 count: 1/16 ... for now.

Sunday, January 17, 2016

Monogamy Totally Means "With Three," Right?

This past week I've gotten a lot accomplished, and it's all down to project monogamy.

Or, how I do monogamy, anyway, which apparently means that I'm only spending my time with three projects instead of eleventy-nine.

Close enough.

The three projects I've been monogamous with (hey, they all know that they are special.  Love the one you're with, amirite?) are:

Lilli Pilli -- my spreadsheet tells me I'm at a solid 25% with this one.  As I've mentioned before, I'm doing this for my Potions OWL in the Harry Potter Knitting and Crochet House Cup.  OWLs (Ordinary Wizarding Levels) in the Harry Potter novels are the exams the students take in their fifth year, to help determine their course of study as upperclassmen.  In the HPKCHC an OWL is a project that you expect to take 2-3 months of solid work.   I'm trying to get as much done before the 24th as I can, as that's when I can cast on my Order Mission.  (I promise it all makes a weird sort of sense if you're in the middle of it.)

Shawl in Progress, with Bonus Dead Grass and Door Mat in Background
Since it is my Potions OWL, I've renamed the project, "For the Potions Master."  RIP Alan Rickman. You will be missed.


That Orange Stripe Tho' - Halloween Socks -- these are my purse knitting, and my "I can't knit lace and talk to you at the same time" knitting.  


These are just like they were last time you saw them.  Only more so.

And then I finished up the Barley hat I mentioned last week for 25000 Tuques. It knit up in under a week, but I figure there's really only two or three days of knitting in there.  Worsted weight hats are fast, yo.  And I used up the other half of that skein of Heartland, so good job all around.

Barley Hat Expertly Modeled by "Sullen Hipster" Best Friend
(Trying Not to Crack Up)
And then, because I can't leave well enough alone, I've started another hat for 25000 Tuques.  This is Laurelhurst out of some Wool of the Andes I had in stash.


What?  That still only counts as three -- I finished one!

Monogamy.  I'm doin' it right.

Tuesday, January 12, 2016

FO: Happy Christmas Socks

I have had a Great Sickness (by which I mean lingering and really annoying head cold) so actual creativity has been somewhat hampered by a head full of what feels like congealed oatmeal.   So in lieu of actual content, I present to you:  socks I finished two weeks ago.


I've decided that I'm starting a tradition (doing something two years in a row is totally a tradition, right?) of working on Christmas socks for myself during the month of December.  The object isn't really to have finished sock to wear this Christmas, it's to have lovely seasonal yarn and a project that makes me happy to work on during the holidays.

Just like with my Halloween socks (still on sock #2) the great thing about holiday themed socks is that most holidays come 'round every year.

In 2014 I finished a pair up on Christmas Day, which I couldn't have timed better if I'd done it on purpose.  These were finished on the 27th, which is still pretty darned perfect, if you ask me.

I am becoming a convert to the ways of the toe-up sock.  Now that I have discovered that it is possible to knit them where they actually fit, I'm as likely to go toe-up as top-down.  That's quite a journey from where I was in 2011!

Project Notes

Pattern: Double Gusset on Bottom Toe Up Sock Pattern by Carrie Ramirez
Yarn:  Simply Socks Yarn Company Poste Yarn, Striping in the "Jollyville TX" colorway
Total Yardage: 275 yards
Needles:  US 1.5 (2.5 mm)
Started: November 26, 2015
Completed: December 27, 2015

I posted a picture on Instagram when I finished these (like you do) and as a last second whim I double checked to see if the designer has an Instagram account.  She does, so I tagged her.  Apparently I made her day as no one had ever tagged her on something they were knitting that she'd designed before.  I'm so glad I thought to include her.  It didn't take more than an extra second or two of my time and it really made her happy.

It even warranted a shout out on her blog!


I just love how the little things we do can end up meaning so much to someone else, don't you?

Sunday, January 10, 2016

Adventures in Not Podcasting

I am extremely lucky in my friends for many reasons.  Not least of which is that many of my close friends are also makers of one sort or another.  Crochet, knitting, sewing, cooking, tatting, weaving, drawing, painting.... name a craft and I bet someone in my circle does it, has done it, or is already planning to learn how.

Jess, Koren and I have a regular hang-out scheduled for most Friday nights.  We have dinner together, talk about what we're making, watch some TV or a movie, or maybe have a YouTube Dance Party.  Some variation of a weekly gathering has been happening at my place for years.  

About a year, year-and-a-half ago, we discovered knitting podcasts (this is all leading somewhere, I swear).  I was a late adopter -- I sort of peripherally knew that knitting podcasts were a thing.  And now I actually can't remember what prompted me to check them out and start listening.  It might have been something on one of my blogs, or that I saw on Ravelry.  Who knows?   The point is, I started listening and then bullied badgered convinced Koren and Jess to listen too.

And we started thinking about the conversations we have most Friday nights.  What are you working on?  What are you reading? What have you finished? What do you think of this pattern?  Hey, that designer has her patterns on sale... that sort of thing.

And then somebody made a joke about podcasting and how we should do it.  And someone else pointed out that she sounds like a 12 year old girl who's been caught sucking helium again when she's on tape (she actually said "on tape" because she is old).   Then someone else pointed that the second someone was ridiculous.   The conversation sort of devolved at that point.

But the idea of the "Not-a-Podcast" was born.  We occasionally sit down to a bit of semi-structured talk about what we're making, what we're watching and reading, and what's got us excited.  It's a great way to keep excited about our crafting lives, and it's really fun.

This past Friday there was a plague in two of our houses, so we decided to cancel Friday night. But Koren very cleverly pointed out that there was no reason we couldn't still Not-a-Podcast if we got on Google Hangouts.

So we very seriously set up a Google doc for our show notes, and proceeded to have a delightful time.  There were a few initial technical hiccups, but all in all it was a great success.  I may or may not have started out by saying, "Welcome to Episode 1 of Yarny Tonkin'.  I'm Bekah, also known as ... Bekah."  A bit of an homage to the KnitGirllls there.

No.  We aren't really going to do a podcast.   But if we did, we'd totally call it "Yarny Tonkin'".

A quick update on what's on my needles this week -- I'm 14% done with Lilli Pilli (why yes, I do have a spreadsheet, why do you ask?)  That's about 32 garter stripes into the first section.


I have a bit more to do, and then it's on to the first lace section.  I can't wait to add in the orange.

And then I started a hat for 25000 Toques -- a group that is organizing hand knit hats to give to Syrian refugees in Canada.  I think it's a lovely thing. Check it out, if you've a mind to.


I'm making Barley out of the yarn leftover from Rowan's Bankhead hat (good news on that front -- it fit and he likes it.  Much better than last year's hat attempt).  For some reason I cannot for the life of me get a color-accurate picture of this yarn.  It's actually a very pretty olive green.

Sunday, January 03, 2016

Setting Intentions, 2016 Edition

Every New Year I think about what I want from and for the coming year.  Health, productivity, a clean house, specific projects I'd like to accomplish, that sort of thing.  I've got a lot of ambition for 2016, and I'm ready to start making it happen.  

On New Year's Day as I sat with three of the best people I know, I closed the books on one or two things.

Where Dwell the Brave at Heart
I knit Wee Weasley sweaters for the family for Christmas this year.  And predictably enough I finished all of them but the one intended for me (I figured I could always make mine later, right?  It's not like I was surprising myself.)   Koren and Rhiannon both very wisely pointed out that if I didn't cast the thing on and finish it though, and if I didn't do it right now while I still have the pattern memorized, well... I never would.  

Dang, That's a Lot of Ravenclaws
I also finished the toe on my Halloween sock (yeah, I know.  But I'd already finished my Christmas pair, and Halloween comes every year.)

I finished projects that were lingering, and projects that were intended for no purpose but my happiness.   

In 2016, may I finish what I start, even when it isn't new and exciting anymore, and may I remember to pursue my own joy.

So, a few projects cast off and completed, I moved on to beginning new things.

I cast on the second Halloween sock, because while I could wear one Halloween sock and one Christmas sock and call it good... I'm not going to.

I still love that orange stripe.
I also cast on an entirely brand new project.  An ambitious project, one that calls for around twelve hundred yards of fingering weight yarn in some of my very favorite colors.   I'll be knitting the Lilli Pilli shawl by Ambah O'Brien as my Potions OWL in the Harry Potter Knitting and Crochet House Cup.


I'm only just begun, and I'm looking forward to working on it over the next few months.  Since I'm doing it as part of an online game with other knitters, I have an externally imposed deadline that will help me keep this from languishing.

In 2016, may I continue to work towards completing what's already begun, while still looking forward to the next wonderful opportunity.  May I know myself well enough to find solutions, games, and motivations that will help me succeed in everything I attempt.

So Say We All.

Crafting Goals for 2016

I don't do resolutions.  While there is certainly societal pressure to be resolute in January, there is surely just as much pressure to categorically fail in February.  I'd just as soon skip all that.  So while I don't have any resolutions to share with you, I do have some goals.

In 2016, I would like to complete greater than 10,000 yards of knitting and crochet.  For context, in 2014 I hit 10,751.  2015's total hit a nice 10,415 (if you have a Ravelry account, you can see my 2015 finished projects here).  So essentially my goal is to carry on grooving.

In 2016, I intend to complete 16 pairs of socks.  (This idea was totally ripped off of inspired by Mediapuruana. I'm not actually playing along other than in spirit.)  Socks that were on the needles in 2015 count, so long as they are finished in 2016.  So my current standing is 1/16.  Woot!

In 2016, I will limit my yarn purchases to festivals, shows, and the two yarn clubs I'm currently enrolled in (Yarnbox.com's sock box, and the Erin Lane Indie Yarn Carnival, in case you were wondering.)   Jess, Koren, and I are making plans to go Yarny Tonkin' in Nashville at some point this year.  For my purposes that counts as a festival (I bet there will be sushi involved), but I only get to do this once.   I've done a great deal of yarn acquisition in the past year and a half.  And I ain't even sorry.  But I'd like to slow down and enjoy some of the really excellent yarns I currently own. Also, I'm about out of room.

In 2016, I will finish my three oldest, biggest, or oldest AND biggest works in progress:

My Circles to Squares Afghan, which is about 50% complete.



My Cosy Stripe Afghan, also at 50%.


And my Knitting in Red Shawl.  I estimate I'm around 65 - 70% on this one.


This one has a lot of Intention in it, and I've left it to linger for far too long.  I've already begun working on it again, and it feels good to put some new and fresh energy into it.

What are your Intentions and Goals for 2016?

Tuesday, December 29, 2015

FO: Nurmilintu

I actually finished this a couple of weeks ago, but it's been awfully December around here, with all of the attendant busy-ness that is normal for our family this time of year.  (Actually, there was all the normal busy-ness plus a little extra, if you count Rhi's graduation, and I certainly do.)

Anyway, all of which is to say, I've finished up Nurmilintu!  This was one of the projects that was a serious contender for my January 1 Cast On last year (I ended up going with the Denver Cowl, if you'll remember, in my Coffee Break Yowza Whatta-Skein instead).   I ended up casting it on in March during my "Pinks and Neutrals" period.

It's a great pattern - asymmetrical, garter (including the lace), and it handles variegation like a champ.  


I started weighing my yarn every time I finished a section - I wanted to see if I would have enough left over to knit an extra garter stitch and lace section.  Basically I wanted to use as much of my yarn as I could.  In the end I just knit to pattern though - I had enough left over to knit another garter section, but I really wanted to end on the lace, and that I did not have enough for.  


See that lace?  It makes such a nice edging.  I'm glad I decided not to go on to add more garter (even if I do have around 90 yards of leftover yarn.)

Project Notes

Pattern: Nurmilintu by Heidi Alander
Yarn: Rowan Fine Art in the "Chiff Chaff" colorway
Total Yardage: 345 yards
Needles:  US 6 (4.0 mm)
Started: March 21, 2015
Completed: December 8, 2015

Sunday, December 20, 2015

Tidings of Peppermint Joy

When Rhiannon was very little, she misheard the lyrics to a classic yuletide hymn, and believed that the Merry Gentlemen in question were being offered tidings of peppermint joy.  

In that spirit, I started the weekend Thursday night at Starbucks with Koren, a Peppermint Mocha, and my sock knitting.

Peppermint Joy in Action

Then Carl and I celebrated our 16th and 18th anniversaries (married and first date, respectively) on Friday.  He's the best husband I've ever had and I'm keeping him.

Saturday and Sunday were spent shopping, getting a haircut and hanging out with Morgan, more shopping, thinking about baking (but not actually doing any) and of course knitting.

Taking a much needed break between Christmas shopping destinations

Christmas shopping the weekend before Christmas can be awful.  But if you go in with the right attitude, the right company, and a healthy sense of the ridiculous, it can be a lot of fun.

My life was empty and meaningless before I knew of the Tinsel Pig

In knitting news, my Christmas socks are moving along nicely.  One sock completely done and the toe well started on the second.  I rather like having a Christmas project that I can work on during the season, without any particular pressure to finish. I finished a pair of Christmas socks on Christmas day last year. I'm enjoying knitting these this year, and I'll enjoy wearing them next year.  (That's the great thing about Christmas.  You get one every year.)


So now I'm sitting in my living room, enjoying my tree, having a cup of peppermint tea, and ... watching Series 22 of Top Gear (3 out of 4 soothing things isn't bad, right?)


G-d rest ye, and let nothing you dismay.  I wish you tidings of peppermint joy this holiday season.

Sunday, December 13, 2015

Big Doings

It's been the very best kind of busy here this week.

Morgan's holiday band concert was Thursday night.  It's set up so the music never actually stops from start to finish -- they rotate through the full band, the jazz band, various solos and ensembles without ever stopping.  There was a very cool acapella drum piece done by the drumline."  One of the drummers sat in the middle of the stage and played "air drums" while the rest of the drum line stood behind him and "sang" what he was playing.  It was seriously neat.   

They wrapped the whole thing up with their half-time show.  This year was Bruno Mars ... which works surprisingly well given the number of brass instruments the band has.  It was awesome.  Loud, since we were in an auditorium, but awesome.

This is what good parenting looks like.
I should back up and mention that earlier that day Carl helped Rhiannon move into her new apartment.  I wasn't there for that, since it happened while I was at work.

I mention it though because with Rhiannon here for a couple of weeks we had extra furniture in the living room.  Which further meant that there really wasn't room to also have Christmas in there.

So Friday morning Carl and I got up and cleaned the bejeebers out of everything, put up the Christmas village, went to all the stores, came home and put up the tree, discovered most of our lights are buggered (note to self:  buy new lights on after-holiday clearance this year), decorated the tree, ate festive Hanukkah fried chicken, had some wine, and then decorated for Rhiannon's graduation party.


Did someone say graduation?

That's right-- Rhiannon graduated magna cum laude, with university honors on Saturday.  We were at Murphy Center at 8:15 Saturday morning to watch my beautiful baby girl complete another major milestone with grace, excellence, and general ass-kicking.  (She smuggled in her knitting and worked on a sock throughout the ceremony.  That's my girl.)  I may have cried.  Just a little. Er... not about the knitting.  About the graduating.

Get a load of this beauty.
Right after graduation we rushed back to the house (by way of Jimmy Johns, because someone forgot to eat breakfast) to finish getting ready for her party.  


We had several friends over to celebrate with Rhi, eat a little nosh, and drink a little champagne.  It was completely lovely.

And then...

(you thought surely I was done, didn't you?)

...and then we got ready to go to my office Holiday Party.  The party was supposed to last from 6:00 to 9:00, but Carl and I bailed at about 7:15.  Lame, but I was so tired and I figured I'd done my due diligence and made an appearance.

I was sound asleep on my couch by 9:30.  What a party animal!

So today my major ambitions have been:  knit a swatch, weave in some ends (there will be some FO posts soon!), and embrace the lifestyle of the roly poly sloth.  

It's been a great weekend, full of really big doings.   As I post this Morgan and Carl are making latkes and jelly donuts.   When I announced that I was too tired and something had to give they looked at each other and decided that they were on it.  

I am entirely delighted, and am choosing to be at peace if some of them are pink.  (There was talk of beets).  There are consequences to choosing not to be involved, and I am prepared to accept them.


Happy Festival of Lights, y'all.

Sunday, December 06, 2015

Gettin' Busy and FO: Leg Warmers for a Certain Young Miss of My Acquaintance

It's been a relatively quiet week here at chez woolly.  We have very brief respite between the overindulgence that is Thanksgiving, and the madness that is the entire rest of December.  (At home anyway.  At work we just launched our annual Performance Assessment process -- the first since the two companies merged, and it's a bit of a cluster... but here at home things are nice and calm).

Hanukkah starts this evening, and I'll be lighting the candles.  We probably won't have a big celebration this year, but we're making plans to enjoy some fried foods and listen to some traditional Hanukkah tunes.  

This coming week also holds lunch dates with good friends, Christmas concerts, and my baby girl's graduation (and subsequent move back out of the house after a very brief, furniture-filled visit).   Oh, an my work's Holiday Party, if I can't weasel out of it.

It's pretty much GO GO GO from here 'til New Year's, so I've spent this morning doing some quiet reflection, goal planning, and just generally soaking in some peace.

And Pie.  Peace, Planning, and Pie.

I've been hustling to finish a pair of leg warmers I'm making for Jess' oldest sprogling.  She's a dancer, and what dancer doesn't need sparkly leg warmers?  (I'm also totally cheating and combining an FO post with a weekly wrap-up post.  My blog, my rules. Fight me.)


I did a bunch of research (and by "research" please understand I mean "trolling for patterns on Ravelry") but in the end I just did my own thing.  The pattern goes like this:

CO 52 sts in worsted weight yarn on size 6 needles
K2P2 until you've lost the will to live (usually after around 4" or so)
Now K2P2 some more until you've reached ~18"
BO, using a modified JSSBO*
Sob quietly as you cast on for the second one.

*Okay -- so Jeny's Surprisingly Stretchy Bind Off does just exactly what it says on the tin.  You basically add a little extra space in each bound off stitch by doing a backwards YO before you bind the stitch off (please find real instructions here.)    To modify it for the leg warmers, I just did the YO between each K stitch and each P stitch, but not between the stitches that transition between knit and purl.  That gave me just the perfect amount of stretch.

Project Notes

Pattern: My Own -- Simple K2P2 Rib
Yarn:  Caron Simply Soft Party in the "Silver Sparkle" colorway
Total Yardage: 253 yards
Needles:  US 6 (4.0 mm)
Started: November 8, 2015
Completed: December 6, 2015

I've cast on another set for Little Sister, using the yarn that's left (#matchymatchykal -- is that still a thing?)    For Bu's I'm following the same basic recipe, but I cast on 36 stitches, and will go until it looks right or I run out of yarn -- whichever comes first.

In other news, I arbitrarily decided at some point during November that I'd like to bust 10K yards knit and crocheted in 2015 (note to self:  have this revelation earlier in the year next time).  I'm sitting pretty on 9622 yards so I'm only lacking just short of 400.  

I'll have Bu's wee leg warmers, but that'll only net me 75 yards at best (since that is how much I have left).  I also have a few more little gifts to tie up here and there. 

But if I want to make my goal, I'd better plan to get serious.   To that end, I pulled Nurmilintu back out of the work-basket.


That should do it.

Sunday, November 29, 2015

Thankful for Homeowners Insurance (Among Other Things)

Happy (slightly belated) Thanksgiving to those of you that observe it, and happy late November to those of you that don't.  It has been a great weekend of feasting here at chez woolly, and I have a lot to be thankful for.

I am thankful for Chocolate Bourbon Pecan Pie
We hosted two meals here.  My oldest daughter came home from college (I say that like she's going to college on the moon -- she's in the same town as we are, we just don't get to see her nearly enough because she has silly "work responsibilities" in addition to school), along with my niece Sarah and Koren.   It was a lovely dinner, and I make a damn fine turkey if I do say so myself.

And also pie
Yesterday we hosted Friendsgiving and had a mighty feast of leftovers.  Jess and Koren brought over some of their leftovers to add to what we had left and a second mighty feast was enjoyed.

And yes, there was more pie.

You can tell it's apple pie because there's an apple on it.
I baked a lot of pie, y'all.

I am also thankful for homeowner's insurance -- and yes that probably should sound a little ominous. The drywall ceiling collapsed in the remodeled attic space that is connected to Morgan's bedroom, and there was evidence of moisture damage in the decking of our roof.

I have certain basic expectations around what I need my roof to do.  Keeping water on the outside of the house is somewhere near the top of that list.  (You had one job, roof...)

Carl and I had replaced the roof after we had a lot of hail and tornado damage about ten years ago.   Carl actually ended up doing almost all of the work himself, with occasional assistance from some of our friends.  I learned during this time that while heights don't bother me, ladders do.  So I didn't end up helping all that much.

Anyway, we were giving each other the side eye and wondering if we'd somehow managed to screw up the roof (and it took ten years to notice?  I don't know, we were both kind of freaking out due to the giant freaking HOLE in the ceiling of one of our upstairs rooms.)

This is not good.

Carl called a roofer to come out and give us a quote.   Wonder of wonder and miracle of miracles, the roofer said "looks like wind damage to me, you should call your insurance company."   Which we did, and long story somewhat shorter the insurance dude agreed and cut us a check.

So Carl called the roofers back up and scheduled them to come out and replace our roof on Thursday.  Last Thursday.  Yes, THAT last Thursday.  The one with the turkey and cranberries and pie.

He very sensibly broke this news to me while I was at work in Franklin and too far away to smack him.

That said, while I wasn't entirely prepared to be woken up at 6:30 in the morning by cheerful men running around and banging things on my roof (at least they were cheerful), the whole thing was done and over with by 2:00 p.m., and my roof is replaced and paid for.  And we weren't having dinner until 5:30 anyway, so no harm, no foul.

And hey!  We have enough money left over from the insurance payout to fix our septic tank.

The one that's under the deck that the previous homeowners built.

Sigh.


I might have started a bit of a Christmas sock on Thursday, in between cooking a feast and listening to pneumatic guns firing on the roof.


Just to take the edge off.  You understand.


Sunday, November 22, 2015

FO(s): A Coupla Cowls

There's been a flurry of knitting activity over here at chez woolly, but as I threatened earlier this month, I can only tell you about some of it.  I'm mixing a healthy dose of selfish knitting in with my gift knitting though so that I don't rage-quit forever and take up basket-weaving or tying knots for fly fishing or something.

I've finished the 3 (4) Color Cashmere Cowl out of Knit Picks Capretta earlier this week.  It hasn't been blocked yet, but the ends are all tucked in, and I'm calling it good.


The light has been all wrong to get really good pictures lately.  We are entering into the season of harsh light that is only available on weekends.  In another few weeks it'll be dark when I leave the house and dark when I get back home again during the work week.  So as far as I'm concerned that means there is no sun Monday through Friday in the winter.

Last year I solved for this by taking my finished objects into work and taking pictures there.  I've recently had to move out of my office, so that solution might not be available for me.  (And as I typed that I realized that the solution is to bundle up and go outside during my lunch break.  I can find a scenic spot to stage photographs somewhere near my building.)

Anyway, the cowl went together without a hitch, and this time I didn't run out of any of the colors before I was done, like I did with the other one.  Somewhere between using four colors instead of three, and purchasing a commercial yarn (rather than the indie cashmere/silk I got at Stitches) I had more than plenty.   I did manage to use up all but about a gram of the light gray, but I have leftovers of all the rest.  Perhaps I'll do some wristers to match the cowl.

Project Notes

Pattern: 3 Color Cashmere Cowl by Joji Locatelli
Yarn:  Knit Picks Capretta in Caviar, Platinum, Harbor and Turmeric
Total Yardage: 621
Needles: US 7 (4.5 mm)
Started: September 23, 2015
Completed: November 18, 2015

Once my second giraffe neck-warmer was finished, I decided I wanted to use some of the new yarn I picked up at SAFF (note to self:  what if you used some of the yarn you picked up LAST SAFF?)

I also wanted a quick fix kind of project.  Something you can just throw yourself into and then come up for air two days later with a finished object.   I knew I wanted to use the Twist Fiber Studio Vanderbilt Bulky I had in teal and a purple/pink variegated.  I don't normally knit with bulky, but something about these colors and the delightfully soft yarn base just called to me.  Also Koren was there chanting "BUY IT BUY IT BUY IT" so that might have been a factor.


I dug around on Ravelry looking for patterns, and ran across the Modish Cowl by Stephen West.     I made a couple of adjustments to allow for the fact that I only had about 160 yards, and BOOM!  This morning I finished weaving in the ends and sewing it closed.

Morgan was very sweet and modeled for me
This is one of those really great uses for garter stitch.  It's simple, pleasant, squooshy, and graphic.  I love it.


Over all I'm really happy with it, and could easily see knitting another variation (possibly long enough to wrap twice, out of a worsted weight?  The possibilities, they are endless.)

Project Notes

Pattern: inspired by the Modish Cowl by Stephen West
Yarn:  Twist Fiber Studio Vanderbilt Bulky in "Crystal Blue Persuasion" and "Roller Rink Disco Party"
Total Yardage: 164 yards
Needles:  US 11 (8.0 mm)
Started: November 20, 2015
Completed: November 22, 2015

A++ would knit again.

Now I just need to decide if I'm going back to working on Christmas Gifts or if I'm going to say "ta heck with it," and Grinch-along with the Knitmore Girls.  Stay tuned for further developments as they transpire.

Saturday, November 14, 2015

FO: Bankhead Hat

So, the thing that you should know is that I tried to give Rowan a hat for Christmas last year.  Well, actually, I successfully gave Rowan a hat last year, but it was entirely insufficient to cover his manly brainpan and voluminous hair.  (It looks great on Jess though, so there's that.)


Anyway, I'm not sure Rowan even wants a hat, but opening a present on Christmas Day, trying to wrestle it on to your noggin and having to give up because, just... no.  Well, that's no fun for anyone.

And after the great success with the striped sweater I know that he does actually appreciate and enjoy receiving hand knits.  Though, and this may be my downfall, there was a great deal of consultation around the sweater.  This hat? I'm just springing it on him.

This hat is actually rather greener than this.
(On the other hand, it's just a damn hat.  It took like 5 hours, tops, so if he doesn't like it, I'll be bummed from a "gave the kid that's hard to gift for something lame" aspect, but in terms of pure time and energy outlay?  I'll be fine.)

Confession time:  I bought yarn for this.  No, more than that.  I bought acrylic for this.  I know. I know.  But hear me out -- this is a hat for a 14 year old dude.  I picked up some Lion Brand Heartland at the Hancocks down the way (and okay, I might also have gotten some Bernat Satin in Navy too.  I needed options didn't I?)

Project Notes

Pattern: Bankhead by Susie Gourlay
Yarn:  Lion Brand Heartland in the Joshua Tree colorway
Total Yardage:  135.5 yards
Needles: US 7 (4.5mm) 16" circular
Started: October 21, 2015
Completed: October 29, 2015

Saturday, November 07, 2015

FO: Big Socks for Big Feet

It is with happiness and no little sense of relief that I report to you that Carl's Big Dude Socks are (finally) done.


This is the first pair I've ever knit for him, so I didn't really know what to expect.  I started making plans before I realized that my gauge had changed, so right off the bat I started with some faulty assumptions.  I measured his calf, did some maths based on what my gauge had been, and cast on.

No I didn't do a gauge swatch, don't be ridiculous.

Anyway, I knew going in (and in fact made mention in this very blog) that it might take a couple of tries to get it right.  And so it did.   I knit on the first sock half-heartedly for five or six months, until I'd finished the heel flap and about half the gusset stitches.  In July I finally faced the music and admitted that the socks were too big at the calf and too small across the instep.  An uncomfortable combination at best.

There was nothing for it but to frog and start again.


The second attempt was far more successful.

One of the challenges that I needed to face was, and there's no way to put this delicately, Carl's weird-ass feet.  The diagonal line from his heel to the top of his foot (what the heck is that called?) is longer than average.  (I guess, I mean I don't really go around measuring a lot of dude's feet.  Maybe they're perfectly normal.)

(They aren't perfectly normal. They're weird.)


This bit here that's in red -- on Carl's feet that line is particularly deep.  He has bootylicious heels, or something.  Anyway, I needed to create extra room through that part of the sock.  My solution was to knit the heel flap longer.  A longer heel flap means more stitches picked up for the gusset, which in turn means a deeper gusset, which  means that his weird-ass foot foots in the sock perfectly.

Victory!

And since he loves them, and I already bought yarn to do another pair, I'm going to write down what I did,  (And if you want to knit socks for Carl, or some other weird-footed dude of your acquaintance, you can too).

Carl's Big Dude Socks

CO 76 stitches, join in round, being careful not to twist (unless your man's foot is actually a klein bottle, in which case twist away, you know your business better than I do).

K2 P2 for approximately 2 inches or until you've lost the will to live, whichever comes first.

Purl across, decreasing 4 stitches evenly across, using a P2tog.  (72 stitches).

K3, P1, until desired leg length is reached.

Heel Flap

Rearrange the stitches so that there are 37 stitches on the instep, leaving 35 stitches for the heel flap. The instep should begin and end with a purl stitch -- this makes for a pretty transition down the length of the foot.

At this point you have a decision to make.  The clever among you will have realized that an odd number of stitches and a traditional Slip 1, K1 heel flap don't mix.  I solved this by ignoring it and did the following:

Turn work.

R1:  Slip 1, p across.
R2:  Slip 1, K1 across until the last stitch, K.

If that bugs you, feel free to add an extra stitch to make the heel flap an even number of stitches.  But I promise you, no one will ever notice.

Repeat rows 1 and 2 a total of 22 times (44 rows).  (A "normal" heel flap would be closer to 18 repeats and 36 rows.  This is where I built in the extra space for Carl's bodacious heel).

Turn Heel

R1: Slip 1, P19, P2tog, P1
R2: Slip 1, K5, K2tog, K1
R3: Slip 1, P to 1 stitch before gap, P2tog, P1
R4: Slip 1, K to 1 stitch before gap, K2tog, K1

Carry on repeating rows 3 and 4 until you run out of heel to turn.  (I am really assuming you are already familiar with basic heel flap sock construction.  If you aren't, I'm very sorry and would like to recommend Stephanie Pearl-McPhee's "Sock Recipe: A Good Plain Sock" as a great place to start.  It's in Sock Rules, which you should totally own.)

Gusset

Pick up and knit stitches along the side of the heel flap.  You'll pick up 1 stitch in each slipped stitch chain.  You should be getting 22 stitches. (This is not rocket surgery.  Pick up the number that makes sense, and just make sure the other side matches.)

Work across the instep in pattern.

Pick up and knit stitches along the other side.

Arbitrarily decide that your round now begins at the back of the heel.  You can put a stitch marker if it would make you happy to do so, though I rarely bother.

R1: Knit to two stitches before the instep.  K2tog.  Work across instep in pattern.  SSK, K to end of round.
R2: Knit to three stitches before the instep.  K2tog, K1.  Work across instep in pattern.  K1, SSK, K to end of round.
R3: K to instep.  Work across instep in pattern, K to end of round.

Repeat Rounds 2 and 3 until 35 stitches remain on the bottom of the foot.   (72 stitches total: 37 across the instep, 35 on bottom).   If you used a stitch marker to mark the back of the heel, you can take it out now.

Work even until approximately 2" before end of foot, ending after knitting the stitches on the bottom of the foot.

Toe

Rounds will now begin right before the first stitch of the top of the foot.

R1: Knit 1, SSK, knit to three stitches before the end of the top of the foot, K2tog, K1. Knit across the bottom of the foot  (70 stitches total: 35 on top, 35 on bottom)
R2: Knit
R3: Knit 1, SSK, knit to three stitches before the end of the top of the foot, K2tog, K2, SSK, Knit to three stitches before the end of the bottom of the foot, K2tog
R4: Knit

Repeat rounds 3 and 4 until 28 stitches remain.  Then repeat round 3 until 18 stitches remain (9 on the top of the foot, and 9 on the bottom).

Kitchener closed and Bob's yer uncle, you've got Big Dude Socks!

Caveat Lector:  I just typed these notes up from memory, and they certainly have not been tech edited. They're just basic, heel flap socks with a longer than average heel flap tho'.

Project Notes

Pattern:  Basic socks, see above
Yarn:   Supersocke 4-fach Mali Color,  "Brown Shades" colorway
Total Yardage:  440 yards
Needles:    US 1.5 (2.5 mm), 2 16" circulars
Started:   January 22, 2015 and July 12, 2015, depending on how you're counting
Completed:  November 1, 2015